top of page
  • Biowaste storage tank equipped with a mechanical agitator and double insulating wall.

  • Waterproof entry and exit hatch to contain odors and minimize energy consumption

  • Airflow management device.

  • Prerequisites: Provide an electrical connection and condensate drainage.

  • Safety devices: magnetic conductor to stop the mechanism.

  • Lifting system to facilitate loading of biowaste.

LIN 500 Full Lift

bottom of page